| INDUSTRIAL BOILERS DOMESTIC MARKET (1962 - 2004)
|
| |
|
| No |
BOILERS PARAMETERS
|
FUEL |
TYPE |
PCS |
YEAR
|
| 1 |
500 kg / h |
Fuel oil |
SIGMA AB |
1 |
1996 |
| 2 |
0.5 t/ h * 13 atm
|
|
GSA 0,5
|
2 |
1972 |
| 3 |
GAT 0.8 t / h * 8 atm
|
|
GAT - LDE
|
941 |
1971 - 1978
|
| 4 |
1 t/h * 8 - 13 atm |
Gas, fuel oil |
IBA 1 |
28 |
1972 - 1996
|
| 5 |
2 -4 t/h * 8 –15 atm
|
Fuel oil, gas, lignite |
|
96 |
1964 - 1997 |
| 6 |
4.5 t/h * 15-16 atm *205 C - 350 C
|
Wood waste, gas |
CSR 1 |
62 |
1962 - 1979 |
| 7 |
6.5 t/h * 8 – 25 atm
|
Fuel oil, cellolignine |
CR 16 C |
185 |
1962 - 1994 |
| 8 |
7 – 14 t/h * 16 atm * 350 C |
Sunflower shell, wood waste |
|
14 |
1963 -1980
|
| 9 |
8 t / h * 15- 20 atm |
Cellolignine, gas + oil, gas |
|
39 |
1975 - 1982
|
| 10 |
10 t/h * 8- 63 atm |
Gas, gas + oil, fuel oil, sunflower shell, lignite, wood waste + gas, fue oil + sulphur |
|
974 |
1962 - 1995
|
| 11 |
14 t/h * 16 atm * 350 C |
Wood waste
|
|
3 |
1962 |
| 12 |
20 t/h * 16-40 atm * 450 C |
Fuel oil + gas, blast – furnace gas |
|
42 |
1962 - 1976
|
| 13 |
30 t / h * 15- 40 atm |
fuel oil, gas + oil, lignite |
|
157 |
1974 - 1995
|
| 14 |
45 t / h * 118 atm * 530 C |
|
|
2 |
1975 |
| 15 |
50 t / h * 8 - 40 atm * 450 C |
blast - furnace gas, gas+oil, lignite,gas |
|
176 |
1963-1992
|
| 16 |
75 t / h * 40 atm * 450 C |
Wood waste
|
182461 |
3 |
1985 |
| 17 |
100 t / h * 15 atm * 250 C |
Lignite |
|
16 |
1980 - 1987
|
| 18 |
105 t/ h * 17 atm * 250 C |
Gas + oil
|
76870 |
46 |
1974 - 1980
|
| 19 |
Locomobile boiler 16 atm |
|
CL 16 S |
122 |
1970 - 1974
|
| 20 |
Mobile boiler 30 t / h * 15 atm |
|
|
6 |
1989 |
| 21 |
14 t/h * 16 atm * 350 C |
wood waste
|
drum D1400
|
4.7 tons |
2001 |
| 22 |
76 t/h |
Fuel oil |
|
13 |
2004 |
| |
| TOTAL = 2923 pcs + 4,7 tons (drum) |
|
|
|
POWER STEAM BOILERS DOMESTIC MARKET (1967 - 2004) and parts
|
| |
|
| No |
BOILERS PARAMETERS
|
FUEL |
PCS or tons |
YEAR
|
| 1 |
120 t/h* 100 atm *540 C |
Fuel oil |
31 |
1967 - 1982
|
| 2 |
420 t/h* 140 atm * 550 C |
gas, lignit
|
51 |
1967 - 1999
|
| 3 |
510 t/h * 192 atm * 540 C |
Lignite |
2 |
1990 - 1992
|
| 4 |
520 t/h * 196 atm * 540 C |
bit. Shale
|
2 |
1980 |
| 5 |
525 t/h * 196 atm * 540 C |
Fuel oil, gas, lignite |
4 |
1975 - 1986
|
| 6 |
1035 t/h * 196 atm * 540 C |
Lignite |
14 |
1975 - 1999
|
| 7 |
420 t/h* 140 atm * 550 C |
gas, lignit
|
2025 t |
2000-2002
|
| 8 |
525 t/h * 196 atm * 540 C |
fuel oil,lignite |
72 t |
2001-2002
|
| 9 |
1035 t/h * 196 atm * 540 C |
Lignite |
4634 t |
1996-2002
|
| |
| TOTAL = 104 pcs + 6731 t pressure parts |
|
|
|
RECOVERY BOILERS DOMESTIC MARKET (1962 - 2004)
|
| |
|
| No |
BOILERS |
PCS |
YEAR
|
| 1 |
RECOVERY BOILER. FOR CHEMICAL INDUSTRY |
77 |
1962 - 1991
|
| 2 |
RECOVERY BOILER FOR METALLURGICAL INDUSTRY |
13 |
1974 - 1988
|
| 3 |
RECOVERY BOILER FOR PETROCHEMICAL INDUSTRY |
50 |
1963 - 1988
|
| 4 |
RECOVERY BOILER FOR FERROUS METALLURGY IND. |
185 |
1963 - 1991
|
| 5 |
RECOVERY BOILER FOR OTHER INDUSTRIES |
20 |
1970 - 1986
|
|
TOTAL
|
345 |
|
| |
|
|
HOT WATER BOILERS DOMESTIC MARKET (1962 - 2004)
|
| |
|
| No |
BOILERS PARAMETERS
|
FUEL |
TYPE |
PCS |
YEAR
|
| 1 |
0.015 – 0,7 Gcal / h |
gas |
VECO |
35 |
1994 - 1997
|
| 2 |
0.12 – 0,35Gcal / h |
Mixt, light liquid, gas, oil |
SIGMA |
24 |
1992 - 1997
|
| 3 |
0.30 Gcal / h |
|
GM 300 |
44 |
1971 - 1974
|
| 4 |
0.35 – 1,4 Gcal / h |
Mixt, liquid, gas |
SIGMA |
57 |
1994 - 1997
|
| 5 |
2 - 15 Gcal / h* 7 - 22 atm |
gas – oil ,gas , fuel oil, liquid |
CAF |
617 |
1962 - 1996
|
| 6 |
12 Gcal / h
|
|
ICPIL |
1
|
1978 |
| 7 |
25 – 50 G cal / h * 10 atm |
Gas - oil , fuel oil, gas |
CAF |
193 |
1962 - 1983
|
| 8 |
100 Gcal / h * 16 atm |
Lignite, fuel oil, gas - oil |
CAF |
122 |
1963 - 1993
|
|
TOTAL |
|
|
1 093
|
|
| |
|
|
INDUSTRIAL BOILERS AND PARTS - EXPORT MARKET (1964 - 2004)
|
| |
|
| No |
COUNTRY- COMPANY |
BOILERS PARAMETERS |
TYPE |
PCS |
YEAR
|
| 1 |
ALBANIA |
|
|
|
|
|
FURNITURE PLANT |
4.5 t / h *16 atm *300C |
CSR 1 |
1 |
1972 |
| 2 |
BULGARIA |
|
|
|
|
|
NATIONAL RAILWAY CO. |
GAT 0.8 t / h *8 atm |
LDH |
20 |
1978 |
| 3 |
CENTRAL AFRICA |
|
|
|
|
|
CARAMBOIS |
4.5 t / h *16 atm *350C |
CSR 1 |
4 |
1976 |
| 4 |
CEYLON |
|
|
|
|
|
FURNITURE PLANT |
7 / 14 t / h * 16 atm * 350 C |
HLK |
2 |
1969 |
| 5 |
CHINA |
|
|
|
|
|
CAO CUN |
G75 t / h * 40 atm * 450 C |
|
3 |
1992 - 1994
|
| 6 |
FORMER CZECHOSLOVAKIA |
|
|
|
|
|
SKODAEXPORT
|
12¸16 t / h *13.5 atm * 250 C |
R 16 |
8 |
1986 |
|
MARTIN VRUTKY |
25 t / h * 13 atm * 220 C |
|
1 |
1986 |
|
ZUKER BRODEK |
25 t / h * 13 atm * 350 C |
|
1 |
1986 |
|
VARNSDORF
|
25 t / h * 37 atm * 445 C |
|
1 |
1986 |
|
(Total) |
|
|
11 |
|
| 7 |
EGYPT |
|
|
|
|
|
HAMRAWEIN
|
25 t / h * 36 atm * 450 C |
CR 17 |
4 |
1969 |
|
ALEXANDRIA – EGYPT |
50 t / h * 36 atm * 450 C |
CR15 |
4 |
1969 - 1978
|
|
(Total) |
|
|
8 |
|
| 8 |
GERMANY |
|
|
|
|
|
HALLE |
10¸30 t / h * 8 atm *320 C |
|
8 |
1979 - 1982
|
|
WEISSENBORN
|
64 t / h * 46 atm * 445 C |
|
2 |
1975 |
|
(Total) |
|
|
10 |
|
| 9 |
HUNGARY |
|
|
|
|
|
GANZ MAWAG
|
2 ¸7 t / h * 12 ¸15 atm saturated steam |
HOK |
154 |
1973 - 1975
|
|
TRANSELEKTRO |
2 ¸12 t / h * 6 ¸15 atm saturated steam |
HOK/TKG
|
88 |
1972 - 1984
|
|
(Total) |
|
|
242 |
|
| 10 |
INDIA |
|
|
|
|
|
SIGARENI
|
24 t / h * 42 atm * 450 C |
CR 01 |
4 |
1964 - 1966
|
| 11 |
IORDANIA |
|
|
|
|
|
ZARQA |
50 t / h * 44 atm *370 C |
|
3 |
1978 |
| 12 |
IRAN |
|
|
|
|
|
TRACTORS WORKS |
20 t / h * 11 atm * 220 C |
CR 5 |
2 |
1968 |
|
FURNITURE PLANT |
7 / 14 t / h * 16 atm * 350 C |
HLK |
2 |
1971 |
|
(Total) |
|
|
4 |
|
| 13 |
MONGOLIA |
|
|
|
|
|
ULAN BATOR
|
4.5 t / h * 15 atm * 350 C |
|
1 |
1978 |
| 14 |
NIGERIA |
|
|
|
|
|
SEROMWOOD CALABAR |
7 / 14 t / h * 16 atm * 350 C |
|
4 |
1977 |
| 15 |
NORTH KOREA |
|
|
|
|
|
FURNITURE PLANT |
7 / 14 t / h * 16 atm * 350 C |
HLK |
3 |
1976 |
|
TV SET PLANT |
10 t / h * 8 atm saturated steam |
CR 16B |
5 |
1976 |
|
(Total) |
|
|
8 |
|
| 16 |
PAKISTAN |
|
|
|
|
|
KARACHI –Refinery |
50 ¸ 64 t / h * 22 ¸ 40 atm 450 C |
|
2 |
1976 - 1984
|
| 17 |
POLAND |
|
|
|
|
|
ELECTRIM |
4 ¸10t / h * 8 ¸ 15 atm saturated steam |
ABA 4 |
7 |
1973 - 1976
|
| 18 |
FORMER SOVIET UNION |
|
|
|
|
|
|
2.8 t / h * 16 atm |
CL 16S |
80 |
1971 |
|
|
4 t / h * 15 atm saturated steam |
ABA 4 |
121 |
1972 - 1973
|
|
(Total) |
|
|
201 |
|
| 19 |
YUGOSLAVIA |
|
|
|
|
|
KONOMAGNO
|
2 t / h * 8 atm saturated steam |
ABA 2 |
2 |
1973 |
|
SLOBODA |
2 t / h * 12 atm saturated steam |
ABA 2 |
3 |
1973 |
|
LUKAVAC |
2 t / h * 8 atm saturated steam |
ABA 2 |
2 |
1975 |
|
(Total) |
|
|
7 |
|
|
GENERAL TOTAL
|
|
|
542 |
|
| |
|
|
POWER STEAM BOILERS AND BOILER PRESSURE PARTS- EXPORT MARKET (1977 - 2004)
|
| |
|
| No |
COUNTRY- COMPANY |
BOILERS PARAMETERS |
PCS |
YEAR
|
| 1 |
CANADA |
|
|
|
|
BABCOCK & WILCOX |
2000t/h (boiler parts) |
1247 to |
1993 |
| 2 |
CHINA (mainland China) |
|
|
|
|
PUCHENG |
1100t/h*192atm*540°C |
14000 to |
1992-1995
|
| 3 |
DENMARK |
|
|
|
|
BURMEISTER & WAIN ENERGI |
Pressure parts |
87 to |
1996 |
| 4 |
ENGLAND |
|
|
|
|
MITSUI BABCOCK Ltd. |
Pressure parts for boiler 2000 t/h (including X10 materials) |
7000 to |
2001-2002
|
| 5 |
FRANCE |
|
|
|
|
BABCOCK ENTERPRISE |
Boiler pressure parts (piping) |
100 to |
1996 |
| 6 |
GREECE |
|
|
|
|
ERTEX LTD. FOR P.P.C. – PTOLEMOIDA POWER PLANT |
Superheater coils |
48 to |
1995-2000
|
| 7 |
GERMANY |
|
|
|
|
DEUTSCHE – BABCOCK |
Retrofitting 1035 t/h boilers |
1800 to |
1996 -1997
|
|
BABCOCK BORSIG POWER (for England) |
Boiler pressure parts |
412 to |
2002 |
|
BABCOCK BORSIG POWER (for Italy) |
- Boiler pressure parts |
154 to |
2002 |
| 8 |
IRAQ |
|
|
|
|
|
265t/h*102atm*515 °C-Boiler parts |
2 |
1989 |
| 9 |
IRELAND |
|
|
|
|
Kvaerner Ltd. |
Pressure parts |
428 to |
2003 |
| 10 |
JAPAN |
|
|
|
|
HITACHI-Europe GmbH-BHK (for Germany) |
Boiler pressure parts |
291 to |
1997-1998
|
|
MITSUBISHI HEAVY INDUSTRIES (for Taiwan) |
2000t/h Boiler parts |
3000 to |
1995-1997
|
|
MITSUBISHI HEAVY INDUSTRIES (for Aleppo - Syria) |
600t/h Boiler parts |
478 to |
1995-1997
|
| 11 |
SWEDEN |
|
|
|
|
"ABB CARBON AB
(for Cottbus – Germany)" |
Pressure parts for boiler type PFBC 200 |
1 |
1996 –1997
|
| 12 |
SYRIA |
|
|
|
|
BANIAS – Refinery Co |
120t/h*100atm*540°C (Boiler type C2) |
4 |
1977 |
|
BANIAS – Refinery Co |
Economiser/td>
| 66 to |
2002 |
|
BANIAS – Refinery Co |
Pressure parts for boiler 120 t/h |
13 to |
2003 |
| 13 |
TURKEY |
|
|
|
|
ANATOLIA POWER STATION |
120t/h*100atm*540°C |
4 |
1981 |
| 14 |
SWITZERLAND |
|
|
|
|
SEU SCHENKEL |
Pressure parts for boiler 60 to/h |
620 tons |
2003-2004
|
| |
|
|
RECOVERY BOILERS EXPORT MARKET ( 1963 – 2004 )
|
| |
|
| No |
COUNTRY- COMPANY |
BOILERS PARAMETERS |
PCS |
YEAR
|
| 1 |
EGYPT |
|
|
|
|
ABU - ZAABAL
|
Recovery boiler 14 T / H * 61 atm |
1 |
1975 |
| 2 |
FORMER SOVIET UNION |
|
|
|
|
|
Recovery boiler |
161 |
1963 - 1968
|
| 3 |
FRANCE |
|
|
|
|
LEROUX & LOTZ |
Recovery boiler |
1 |
2004 |
|
GENERAL TOTAL |
|
163 |
|
| |
|
|
HOT WATER BOILERS - EXPORT MARKET ( 1963 - 2004)
|
| |
|
| No |
COUNTRY- COMPANY |
BOILERS PARAMETERS |
PCS |
YEAR
|
| 1 |
FORMER CZECHOSLOVAKIA |
|
|
|
|
RADOMIR |
10¸ 100 Gcal / h; Type R11.6 |
11 |
1986 |
| 2 |
GERMANY |
|
|
|
|
BERLIN |
100 Gcal / h |
8 |
1972 - 1984
|
|
HALLE DIESELSTRASSE |
100 Gcal / h |
2 |
1974 |
|
NEUBRANDENBURG |
50 Gcal / h |
2 |
1975 |
|
SCHWERIN SUD |
50 Gcal / h |
2 |
1975 |
|
ALTCHEMNITZ |
100 Gcal / h |
3 |
1975 - 1979
|
|
DRESDEN - REICK |
100 Gcal / h |
4 |
1975 - 1976
|
|
LEIPZIG NORDOST |
50 Gcal / h |
1 |
1977 |
|
ROSTOCK MARIENECKE |
100 Gcal / h |
3 |
1980 - 1991
|
|
( Total ) |
|
25 |
|
| 3 |
IRAN |
|
|
|
|
|
15 Gcal / h *16 atm |
1 |
1971 |
| 4 |
FORMER SOVIET UNION |
|
|
|
|
|
50 Gcal / h; Type CAF 3
|
213 |
1963 - 1970
|
|
|
3 Gcal / h; Type CTMV |
59 |
1992 - 1997
|
|
( Total ) |
|
272 |
|
|
GENERAL TOTAL |
|
309 |
|
| |
|
|
|
|